MANILA, Philippines — President Ferdinand Marcos Jr. on Sunday visited Tuba, Benguet to inspect a rock shed project on Camp 6 in Kennon Road.
Accompanied by Baguio City Mayor Benjamin Magalong, Marcos again expressed his dismay after seeing that the P264-million project of the Department of Public Works and Highways (DPWH), completed in November 2024, is in “precarious condition.”, This news data comes from:http://705-888.com
“It’s as if nothing was done,” he lamented in Filipino. “It has eroded. It eroded because the protection wall is very weak.”
“It is very low and very weak that’s why the water can seep in,” he added.
Parts of the structure’s foothold caved in when Typhoon Emong pummeled the region last July.
Marcos inspects rock shed project in Benguet

- LTO told to summon 2 DPWH engineers with fake driver’s license
- Pope Leo: We must listen first before speaking
- HEADLINES: DPWH fires Bulacan engineers, blacklists contractors over anomalous projects | Sept. 5, 2025
- 'Trump Whisperer' ex-minister joins Japan PM race
- Go Negosyo, CFO push migrant empowerment
- Marcos says commission on DPWH anomalies to be finalized 'very soon,' mum on Magalong participation
- LGBTQ+ Catholics make Holy Year pilgrimage to Rome and celebrate a new sense of acceptance
- Iran-backed Houthis raid UN offices in Yemen and detain at least 11 employees
- Floods kill over 30 in Indian-controlled Kashmir, displace 150,000 in east Pakistan
- Marcos signs laws declaring holidays across PH